Repairs and Refurbishments
SMV Refurbish - before, during and complete.
Refurbish - Before and after Ashton Coals PT01 Man Transport.
Chassis and passenger compartment extended 600ml
Our Safety Seating System installed with interlocks fitted to safety bar
Rear before and after Refurbishment and Safety Seating System installed
QDS Tow Hitch
Before Refurbish
- Wash and sandblast
- NDT Crack Test
- Replace 40 Tonne Pintle hook
- New safety chain and Latch Locks
- Painted in requested colour code
After Refurbish
QDS Structure Pod
Before Refurbish
- Wash and Sandblast
- Rust sections replaced
- Repairs as needed
- NDT Crack Test
- New Chains and Load Benders
- Painted to required colour code
After Refurbish
Man Basket
Before Refurbish
- Wash and Sandblast
- Crack Tested
- Repairs as needed
- Replaced Folder
- Replaced E Stop Button
- Replaced Hosing
- Painted to required colour code
Man Basket after Refurb
Examples of Finished Equipment after NDT Crack Testing & Repairs